Extension of two BIODEGMA plants in Poland

Because of successful operation of the plants in Oswiecim and Tarnow and the increasing amount of incoming waste our clients requested an extension of their treatment capacities.

Therefore the existing plants have been extended by two BIODEGMA modules each which means an increase of treatment capacity of 50% at Tarnow and 66% at Oswiecim.

By this our clients have benefit from the modular design of the BIODEGMA system. By flexible planning and closed coordination between us and the clients we managed to keep the plants in operation even during extension works.


At both plants the process control system has been upgraded as well. 

Go back